Skip to content

Work, Jobs6 min read

Per Unit Pricing

Price jobs and quotes per unit, such as per square metre, record how many were done, and carry the rest to another worksheet.

Some work is priced by how much of it there is: patio cleaning per square metre, gutter clearing per metre, solar panels per panel. Pricing a job or quote line Per Unit charges for a quantity of a unit at a price for each one, such as 40 m² at £2.50, which is £100 before any VAT. Set up your units first under Settings -> Units.

Pricing a Job Per Unit

Open the job form's Pricing tab and set Current Price Type to Per Unit. Three more things then matter:

  • Unit: Required. It appears under Current Price Type, above the price, as choosing it fills the price in. Choose from your units, or use Add a unit to make one without leaving the job.
  • Quantity: Required, more than nothing. How many units the job is for, such as 40. It can be part of one, such as 12.5.
  • Price Per Unit: The price under the unit and quantity now means this. Choosing a unit fills in its own price per unit, and when you're VAT registered its VAT rate, which you can change for this job.
  • The total: Under the price, such as 40 m² × £2.50 = £100.00, with the VAT and the total with VAT when you're VAT registered.

Everywhere else the job shows what it comes to: the jobs list's price, the job popup (whose Pricing section reads 40 m² × £2.50 with its VAT and total), Planner cards and their totals, and the Round Value report. A per-unit job stays per unit after each visit; its first and alternate prices aren't used.

Pricing a Quote Line Per Unit

On a quote, each service line's Pricing Type can be Per Unit, with the same Unit and Quantity above its Price Per Unit. Choosing a unit fills in its price per unit and, when you're VAT registered, its VAT rate. The line total is the quantity at the price, and the quote's totals and VAT add it up as they do any line. In Process Quote, the pencil beside a service has Per unit beside Fixed price and Hourly per person, with the unit and how many above the price.

Confirming the quote makes each per-unit line a per-unit job, with its unit, quantity and price per unit. One combined job can't be chosen when a line is per unit, as each one is charged for its own quantity.

Recording How Many Were Done

When you mark a per-unit job done, from its worksheet stop or from Complete Job, the Money card has Units done, filled in with all of them. What's charged follows it: change 40 to 20 and the charge halves. Typing your own charge with the pencil still takes priority.

  • Fewer done on a worksheet: The card says how many are left, such as 20 m² left: they'll be offered for a new worksheet when you submit.
  • Fewer done from Complete Job: There's no worksheet to carry the rest to, so only what was done is charged and the job moves on to its next visit.
  • More done than planned: Put in what was done and it's charged for all of them, with nothing left.
  • Prices hidden: Someone whose role can't see prices still puts in the units done, and Work Planner charges for them when the visit's saved.

Carrying the Rest to Another Worksheet

When a worksheet with a part-done job is submitted, the submit options list it under Part done, with the rest still to do, such as 20 m² left, with any outstanding items.

  • Move to a new worksheet: Puts a stop for the rest on the new worksheet. It shows 20 m² left on the worksheet and the Planner, and when it's done it's charged for those 20.
  • Remove from worksheet: Leaves the rest undone. Only the part done is charged, and the job moves on.
  • A rest done in part again: Is offered again when its worksheet is submitted, as many times as it takes.
  • A missed rest: Is recorded as missed for the units it was for, and leaves the job's dates as they are.

When the Job Moves On

Settings -> Organisation Information -> Work Settings -> Jobs Done in Parts decides when a part-done job moves on to its next visit:

  • Move the job on once it's all done: The default. Submitting the first part charges it but leaves the job due, and the job moves on from the day the rest is done. If the rest is left rather than carried, it moves on as the first part is submitted.
  • Move the job on when the first part is done: The next visit is worked out from the first part, as with any job. The rest is charged when it's done, but doesn't move the job again.

Invoices, Quotes and Xero

  • Printed and emailed invoices and quotes: When a line is priced per unit, the lines table gets Quantity, Unit and Price per columns before the amount. Other lines on it show 1, no unit and their amount. Invoices and quotes without a per-unit line look as they always have.
  • Your own templates: Templates made in the editor have these columns added, shown only when they're needed. Templates written in HTML or text can use the quantity, unit and unit_price fields of each line, and the has_unit_lines flag.
  • A changed charge: A charge changed by hand, or with extras on it, prints as the one amount it is rather than a quantity.
  • Xero: A per-unit charge goes to Xero with its quantity and price per unit, so the line there reads the same.

Price Rises

Increase Prices raises a per-unit job's price per unit. The summary shows what the job comes to for its quantity, before and after.

Related articles